1. Pool Excavation
Once your swimming pool has been approved at Council the real action begins, your pool is marked out and the excavation begins.
2. Pool Formwork
Your concrete pool can be formed into practically any shape enabling the best use of space for your backyard and the features that suit your family’s needs, keeping in mind that your pool will be an extension of your house theme.
3. Steel Reinforcing
The pool is reinforced with steel bars spaced in accordance with the Engineer’s specifications. This is elevated from the walls and floor of the excavation on the 75mm bar chairs to ensure adequate concrete cover behind the structural steel cage.
4. Concrete Shell
The end of your swimming pool construction and one of the most exciting parts of the pool construction process. Concrete is pumped into the pool and sprayed onto the walls, shapers then cut the concrete into shape.
5. Plumbing
Once completed the shell is left to cure for a few weeks. During the curing time the plumbing, filter and pump are installed.

Pool Construction
Concrete swimming pools can be one of the most valuable additions to your home architecture.
They can be a life-long investment, a renewable source of entertainment and the 'ultimate leisure get-away'.
There can be no room for error. It must be built right the first time and Neo Pools know how to do it.
Time Line
The estimated time to complete a pool is approximately 3 weeks from the first day of construction.
They can be a life-long investment, a renewable source of entertainment and the 'ultimate leisure get-away'.
There can be no room for error. It must be built right the first time and Neo Pools know how to do it.
Time Line
The estimated time to complete a pool is approximately 3 weeks from the first day of construction.

6. Compacting
With all pools constructed by Neo Pools, backfilling and compacting is always included (as it should be) in the price of your pool. Many pool construction companies add this on as an extra cost.
7. Header & TilesNext comes the header (or coping), there are many choices of styles such as pavers, tiles, stone or timber decking.
8. Plastering
The next stage is the plastering, which is enhanced with the modern colours and strength of colourquartz. This gives your pool a smooth long lasting finish with resilience and beauty.
8. Interior Equipment & Handover
Then it is time to fill up the pool! Once the final checks are completed we give you a demonstration on how to operate and maintain your new swimming pool then it is time for the family to enjoy your new
water playground.